Monday 3rd July 2023

5643's boiler is lifted off the frames.The big news this week is that GWR 0-6-2T No. 5643’s boiler was lifted out of the frames for assessment and repair in foul weather last Friday afternoon.

Keith burning off the ashpan retaining boltsPart of the operation involved removing the ashpan from underneath 5643’s firebox before it could be settled down on the weltrol. Keith is seen here applying some heat to release the retaining bolts.

5643's bunker touches downPrior to that, Caliban’s boiler had been lifted to a position alongside the shed to make way for 5643’s boiler on the weltrol. 5643’s bunker has also been lifted off for inspection and repairs.

Ed descales one of 5643's water tanksOther work has continued on 5643 with Ed descaling one of the tanks in between the showers last Wednesday.

Upholstering of the new guard's compartment bench seat in progressUpholstering of Great Eastern Railway royal saloon No. 5 is still in full swing with a glimpse here of work on the new foam bench seat in the guard’s compartment.

John Davis removing a door step and tacks from GER No. 5John Davis has removed the carpet in the east saloon and is seen removing a door step and unwanted tacks from the floor.

John Dixon cleaning the royal sh*t potJohn Dixon has been giving the royal loo a good clean…..

The royal loo seat varnished and ready for a royal bum…..whilst Tim has given the loo seat a coat of varnish – think he got the better of the two jobs!

Finally, for FRT members, just to let you know that Alan has been busy putting together the latest edition of The Iron Horse magazine which, hopefully, should be sent off for printing this week.